Residence
Thank You
On behalf of the entire Proform team, I want to extend our heartfelt gratitude for granting us the privilege of building your home. It's been an incredible journey, and we are honored to have been part of something this significant for your family.
Designing and constructing a custom home is a deeply personal experience. We understand the trust you placed in us by choosing us as your construction partner, and we've taken great care to ensure that every aspect of your vision has been brought to life with meticulous attention to detail and craftsmanship.
Throughout the project, our team has been dedicated to delivering the four things we believe matter most: communication, craftsmanship, collaboration, and clarity. This manual is an extension of that last one — a reference you can return to for years to come.
As you settle into your new home, we hope it becomes a place of comfort, happiness, and cherished memories for you and your family. Should you ever require assistance or have a question, our doors are always open.
Table of Contents
In Case of Emergency
Project Summary
The existing 1½-story home on the site was removed to make way for this new construction. The finished residence comprises 7,106 square feet across two floors with a 757-square-foot three-car garage, anchored on a permeable paver driveway and surrounded by retained and new landscape.
The program includes a dining room and formal living area centered on a double-sided gas fireplace, a chef's kitchen with a scullery and walk-in pantry, a hearth room off the main living space, two home offices, and a covered outdoor living area with fireplace. Upstairs, the primary suite features a grand closet, dry sauna, and spa bath; four additional bedrooms, an exercise room, a media room, and a dedicated play space complete the upper floor.
Construction began in August 2023 and reached substantial completion in September 2025. The home meets Washington State Energy Code R406 at 7.0 energy credits via an air-source heat pump system, heat-pump water heater, and sealed-envelope construction verified by blower-door testing.
Builder Warranty
What's covered
- Workmanship — Defects in materials and workmanship installed by Proform or our subcontractors, excluding those covered by pass-through manufacturer warranties listed in Section 5.
- Systems function — Proper operation of all rough-in systems (framing, envelope, plumbing rough, electrical rough, HVAC rough) at handover.
- Finish defects — Paint, drywall, trim, tile, and flooring defects that are the result of installation errors and not normal settlement, seasonal movement, or use wear.
- Envelope integrity — Water penetration, air leakage beyond the designed rate, and framing defects that affect structural performance.
What's not covered
- Normal wear, settlement cracks of less than 1/16", and seasonal shrinkage of wood products.
- Damage from owner alterations, unauthorized repairs, or work performed by others after handover.
- Appliance and fixture performance — these are covered by the manufacturer warranties listed in Section 5.
- Consequential damages, including damage to personal property caused by a warranty defect.
How to file a claim
Email warranty@proformbuilds.com with a description of the issue, photos where possible, and the best time to be contacted. A member of our service team will respond within two business days to schedule an assessment.
Pass-Through Warranties
| Product | Manufacturer | Term | Effective | Expires | Documentation |
|---|---|---|---|---|---|
| Appliances | |||||
48" Professional Range EQ-13 · Primary kitchen |
Wolf | 2 years | 09 / 15 / 2025 | 09 / 15 / 2027 | View document → |
Built-In Refrigerator EQ-14 · Kitchen |
Sub-Zero | 2 years full · 12 yr sealed system | 09 / 15 / 2025 | 09 / 15 / 2027 | View document → |
Dishwasher EQ-15 · Kitchen island |
Miele | 1 year | 09 / 15 / 2025 | 09 / 15 / 2026 | View document → |
Washer & Dryer Set EQ-32 / EQ-33 · Laundry |
Miele | 2 years | 09 / 15 / 2025 | 09 / 15 / 2027 | View document → |
| HVAC & Water Heating | |||||
Air-Source Heat Pump · 5-Ton Centrally ducted, HSPF 11+ |
Mitsubishi Electric | 12 yr compressor · 10 yr parts | 09 / 15 / 2025 | 09 / 15 / 2037 | View document → |
Heat-Pump Water Heater NEEA Tier III · 80 gal |
Rheem ProTerra | 10 yr tank · 1 yr parts | 09 / 15 / 2025 | 09 / 15 / 2035 | View document → |
ERV Ventilation System Whole-house balanced ventilation |
Broan AI Series | 5 years | 09 / 15 / 2025 | 09 / 15 / 2030 | View document → |
| Windows, Doors & Envelope | |||||
Window Package U=0.28, triple-glazed |
Marvin Essential | 20 yr glass · 10 yr non-glass | 09 / 15 / 2025 | 09 / 15 / 2045 | View document → |
Asphalt Composition Roofing Presidential TL |
CertainTeed | Lifetime limited | 09 / 15 / 2025 | Lifetime | View document → |
Fiber Cement Siding Lap & panel, factory-finished |
James Hardie | 30 yr substrate · 15 yr finish | 09 / 15 / 2025 | 09 / 15 / 2055 | View document → |
| Plumbing Fixtures | |||||
Kitchen Faucet PL-21 · Pot filler + main |
Waterworks | Limited lifetime | 09 / 15 / 2025 | Lifetime | View document → |
Primary Bath Fittings PL-112 through PL-122 |
Kallista | Limited lifetime finish | 09 / 15 / 2025 | Lifetime | View document → |
How to Book Service
Trade Directory
Seasonal Maintenance
| Task | By | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Exterior | |||||||||||||
| Eavestrough / gutter cleaningClear debris, inspect corners and downspouts | Sub | ||||||||||||
| Roof & flashing inspectionWalk-through inspection, debris clearance | Sub | ||||||||||||
| Exterior glass & window washingWindows, doors, glass guards | Sub | ||||||||||||
| Exterior paint & caulkingVisual inspection, spot repair | Proform | ||||||||||||
| Hose bibs & sprinkler start-upTurn on, check for leaks, program timers | Sub | ||||||||||||
| Sprinkler blow-out & bib shutoffDrain lines before first freeze | Sub | ||||||||||||
| Deck oiling (Ipe)Only if natural finish is preferred | Sub | ||||||||||||
| Mechanical · HVAC & Plumbing | |||||||||||||
| Forced-air filter changeStandard MERV 13 filter | Owner | ||||||||||||
| ERV filter change & annual serviceClean core, replace filters | Sub | ||||||||||||
| A/C seasonal serviceClean outdoor unit, drain lines | Sub | ||||||||||||
| Tankless / heat-pump WH serviceDescale, anode check, sediment flush | Sub | ||||||||||||
| Sewer drain scopeCamera main line from clean-outs | Sub | ||||||||||||
| Sump pump inspectionFunction test, battery backup check | Sub | ||||||||||||
| Interior & Life Safety | |||||||||||||
| Smoke & CO detector testMonthly button test; battery swap yearly | Owner | ||||||||||||
| GFCI receptacle testBathrooms, kitchens, exterior | Owner | ||||||||||||
| Dryer vent cleaningLint trap & full vent run | Sub | ||||||||||||
| Chimney & flue inspectionBoth fireplaces | Sub | ||||||||||||
| Duct & carpet cleaningProfessional service | Sub | ||||||||||||
Care & Cleaning
Windows & Doors
Plumbing Fixtures
Lighting
Tile & Stone
HVAC Schedule
| Component | Make & Model | Serial | Installed | Manufacturer Resource |
|---|---|---|---|---|
Air-Source Heat Pump Exterior · North Wall |
Mitsubishi Electric PUZ-HA60NHA5 |
2509-MEA-00412 | 08 / 22 / 2025 | Manual & parts → |
Indoor Air Handler Mech. Room · Main Flr |
Mitsubishi Electric SVZ-KP60NA |
2509-MEA-00413 | 08 / 22 / 2025 | Manual & parts → |
Heat-Pump Water Heater Mech. Room · Main Flr |
Rheem ProTerra PROPH80 T2 RH375 30 |
RHM-2025-08-7742 | 08 / 28 / 2025 | Manual & parts → |
Energy Recovery Ventilator Attic · Central |
Broan AI Series B210E65RS |
BRN-25-091112 | 09 / 04 / 2025 | Manual & parts → |
Zone Control Thermostats Main Flr · Upper Flr · Primary |
Ecobee Smart Premium EB-STATE6P-01 |
— (3 units) | 09 / 08 / 2025 | App setup → |
Kitchen Range Hood Kitchen |
Vent-A-Hood PRH18-248 |
VAH-25-8834 | 09 / 09 / 2025 | Manual & parts → |
Humidifier Mech. Room · Inline |
Aprilaire 600M 600M |
APR-25-0914 | 09 / 10 / 2025 | Manual & parts → |
Permits, Plans & Reports
| Document | Prepared By | Date | Access | |
|---|---|---|---|---|
| Architectural Plans | ||||
PDF |
Approved Permit Set — Full Drawings
Cover, site plan, floor plans, elevations, sections, details, structural — 20 sheets.
|
McCullough Architects | 08 / 07 / 2023 | Open → |
PDF |
Interior Elevations
Room-by-room interior elevations, cabinetry, tile layouts, fixture schedules.
|
Hyrel Mathias Interior Design | 02 / 19 / 2024 | Open → |
PDF |
Landscape & Site Plan
Permeable paver layout, planting plan, irrigation, sport court, fence details.
|
Core Design, Inc. | 05 / 10 / 2024 | Open → |
| Engineering Reports | ||||
PDF |
Structural Drawings & Calculations
Sheets S-0.0, SD-1, SD-2, SD-3, SD-4 — notes, details, hold-downs, shear.
|
Mulhern & Kulp Structural | 09 / 10 / 2021 | Open → |
PDF |
Boundary & Topographic Survey
Legal boundaries, site topography, existing conditions prior to construction.
|
Core Design, Inc. | 04 / 20 / 2021 | Open → |
PDF |
Impervious Surface Survey
Certified calculation of 42.59% impervious coverage per City of Bellevue code.
|
Core Design, Inc. / R. West, PLS | 09 / 17 / 2024 | Open → |
| Permits & Approvals | ||||
PDF |
City of Bellevue Building Permit
Permit No. 21-121972 BS · Building, grading, utilities, right-of-way, land use approvals.
|
City of Bellevue DSD | 09 / 17 / 2024 | Open → |
PDF |
Agreement for Pervious Surface Maintenance
Recorded covenant. King County Recording No. 20240916000524.
|
City of Bellevue / Owner | 09 / 16 / 2024 | Open → |
PDF |
Final Tree Removal Plan
Arborist report, tree retention calculations, removal approvals.
|
Core Design / Arborist | 07 / 08 / 2024 | Open → |
| Certificates of Inspection | ||||
PDF |
Final Building Inspection
Certificate of Occupancy, issued after final life-safety & structural sign-offs.
|
City of Bellevue DSD | 09 / 11 / 2025 | Open → |
PDF |
Final Electrical Inspection
L&I certification of all electrical rough & finish.
|
WA Labor & Industries | 09 / 09 / 2025 | Open → |
PDF |
Final Plumbing & Mechanical
Gas pressure test, water pressure test, mechanical final.
|
City of Bellevue DSD | 09 / 10 / 2025 | Open → |
PDF |
Blower Door Test Report
2.0 ACH50 achieved — exceeds 2018 WSEC requirement of 5.0 ACH50.
|
Cedar Mechanical / Third-Party | 09 / 05 / 2025 | Open → |