On behalf of the entire Buildwise team, I want to extend our heartfelt gratitude for granting us the privilege of building your home. It's been an incredible journey, and we are honored to have been part of something this significant for your family.
Designing and constructing a custom home is a deeply personal experience. We understand the trust you placed in us by choosing us as your construction partner, and we've taken great care to ensure that every aspect of your vision has been brought to life with meticulous attention to detail and craftsmanship.
Throughout the project, our team has been dedicated to delivering the four things we believe matter most: communication, craftsmanship, collaboration, and clarity. This manual is an extension of that last one — a reference you can return to for years to come.
As you settle into your new home, we hope it becomes a place of comfort, happiness, and cherished memories for you and your family. Should you ever require assistance or have a question, our doors are always open.
Table of Contents
Emergency Shut-Offs Plan
Before You Call Us
| # | Symptom | First thing to try |
|---|---|---|
| 01 | Outlet, light, or counter appliance dead | Check the GFCI in the nearest wet area (kitchen, bath, garage, exterior) — press Reset. If that doesn't restore power, check the breaker in the main panel labeled for that room. |
| 02 | No hot water | Tankless heaters in your home: check the unit's display for an error code; if a code is shown, snap a photo before resetting. Wait 30 minutes before calling — the recovery cycle takes time. If the unit has no power, check the dedicated breaker labeled "Tankless WH." |
| 03 | HVAC not cooling or heating | Confirm the thermostat is set to Cool or Heat (not "Off" or "Auto" between seasons). Replace the air filter if it's been over 90 days. Check the breaker labeled "Air Handler" or "Furnace." The outdoor condenser also has its own disconnect on the wall next to it — flip it to "On." |
| 04 | Garbage disposal humming but not spinning | Power the unit off at the wall switch. Use the Allen key stored in the magnetic clip under the disposal to crank the bottom hex hole back-and-forth several times to free the jam. Then press the small red Reset button on the bottom of the unit. Turn power back on. |
| 05 | Water pooling around the indoor AC / air handler | Condensate drain line is clogged. Locate the drain access (the T-fitting with a cap, near the indoor unit) and pour a cup of distilled vinegar through it. The drain pan should empty within 10 minutes. If water keeps appearing, call us — the float switch may have failed. |
| 06 | Door not latching cleanly | The strike plate is misaligned by 1/16". Loosen the two strike-plate screws, shift the plate up or down a hair, and re-tighten. If the door is sagging away from the latch, the top hinge needs a longer screw — call us, we'll send someone to swap it during your next service visit. |
| 07 | Sticky cabinet or interior door hinge | A single drop of silicone spray or 3-in-1 oil on the hinge pin. Never WD-40 on interior finishes — it attracts dust and leaves a residue that stains wood over time. |
| 08 | Faint burning smell from a new oven, fireplace, or HVAC startup | Normal "burn-off" of factory residues during the first few uses. Open windows, run the kitchen and bath vents on high, and let the appliance cycle through its break-in instructions (oven: 400°F empty for one hour). The smell should be gone within 2–3 cycles. If it persists past a week of use, call us. |
| 09 | Stained grout in shower or backsplash | Skip bleach — it degrades cement-based grout and discolors stone. Use an oxygen-based grout cleaner (OxiClean diluted in warm water) with a soft-bristle grout brush. For natural-stone tile, check the Care & Cleaning page first — some acidic products will etch the stone permanently. |
| 10 | Wi-Fi or smart-home controls unresponsive | Power-cycle in this order: modem off for 30 seconds → back on. Wait 2 minutes for it to come fully online. Then router off for 30 seconds → back on. This resolves about 80% of network issues. If the smart-home panel itself (Lutron / Crestron / etc.) is unresponsive, check its dedicated breaker. |
Project Summary
The existing 1½-story home on the site was removed to make way for this new construction. The finished residence comprises 7,106 square feet across two floors with a 757-square-foot three-car garage, anchored on a permeable paver driveway and surrounded by retained and new landscape.
The program includes a dining room and formal living area centered on a double-sided gas fireplace, a chef's kitchen with a scullery and walk-in pantry, a hearth room off the main living space, two home offices, and a covered outdoor living area with fireplace. Upstairs, the primary suite features a grand closet, dry sauna, and spa bath; four additional bedrooms, an exercise room, a media room, and a dedicated play space complete the upper floor.
Construction began in August 2023 and reached substantial completion in September 2025. The home meets Washington State Energy Code R406 at 7.0 energy credits via an air-source heat pump system, heat-pump water heater, and sealed-envelope construction verified by blower-door testing.
Builder Warranty
What's covered
- Workmanship — Defects in materials and workmanship installed by Buildwise or our subcontractors, excluding those covered by pass-through manufacturer warranties listed in Section 5.
- Systems function — Proper operation of all rough-in systems (framing, envelope, plumbing rough, electrical rough, HVAC rough) at handover.
- Finish defects — Paint, drywall, trim, tile, and flooring defects that are the result of installation errors and not normal settlement, seasonal movement, or use wear.
- Envelope integrity — Water penetration, air leakage beyond the designed rate, and framing defects that affect structural performance.
What's not covered
- Normal wear, settlement cracks of less than 1/16", and seasonal shrinkage of wood products.
- Damage from owner alterations, unauthorized repairs, or work performed by others after handover.
- Appliance and fixture performance — these are covered by the manufacturer warranties listed in Section 5.
- Consequential damages, including damage to personal property caused by a warranty defect.
How to file a claim
Email bryan@buildwise.com with a description of the issue, photos where possible, and the best time to be contacted. A member of our service team will respond within two business days to schedule an assessment.
Pass-Through Warranties
| Product | Manufacturer | Term | Effective | Expires | Documentation |
|---|---|---|---|---|---|
| Appliances | |||||
48" Professional Range EQ-13 · Primary kitchen |
Wolf | 2 years | 09 / 15 / 2025 | 09 / 15 / 2027 | View document → |
Built-In Refrigerator EQ-14 · Kitchen |
Sub-Zero | 2 years full · 12 yr sealed system | 09 / 15 / 2025 | 09 / 15 / 2027 | View document → |
Dishwasher EQ-15 · Kitchen island |
Miele | 1 year | 09 / 15 / 2025 | 09 / 15 / 2026 | View document → |
Washer & Dryer Set EQ-32 / EQ-33 · Laundry |
Miele | 2 years | 09 / 15 / 2025 | 09 / 15 / 2027 | View document → |
| HVAC & Water Heating | |||||
Air-Source Heat Pump · 5-Ton Centrally ducted, HSPF 11+ |
Mitsubishi Electric | 12 yr compressor · 10 yr parts | 09 / 15 / 2025 | 09 / 15 / 2037 | View document → |
Heat-Pump Water Heater NEEA Tier III · 80 gal |
Rheem ProTerra | 10 yr tank · 1 yr parts | 09 / 15 / 2025 | 09 / 15 / 2035 | View document → |
ERV Ventilation System Whole-house balanced ventilation |
Broan AI Series | 5 years | 09 / 15 / 2025 | 09 / 15 / 2030 | View document → |
| Windows, Doors & Envelope | |||||
Window Package U=0.28, triple-glazed |
Marvin Essential | 20 yr glass · 10 yr non-glass | 09 / 15 / 2025 | 09 / 15 / 2045 | View document → |
Asphalt Composition Roofing Presidential TL |
CertainTeed | Lifetime limited | 09 / 15 / 2025 | Lifetime | View document → |
Fiber Cement Siding Lap & panel, factory-finished |
James Hardie | 30 yr substrate · 15 yr finish | 09 / 15 / 2025 | 09 / 15 / 2055 | View document → |
| Plumbing Fixtures | |||||
Kitchen Faucet PL-21 · Pot filler + main |
Waterworks | Limited lifetime | 09 / 15 / 2025 | Lifetime | View document → |
Primary Bath Fittings PL-112 through PL-122 |
Kallista | Limited lifetime finish | 09 / 15 / 2025 | Lifetime | View document → |
How to Book Service
Trade Directory
Behind the Walls
Seasonal Maintenance
| Task | By | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Exterior | |||||||||||||
| Eavestrough / gutter cleaningClear debris, inspect corners and downspouts | Sub | ||||||||||||
| Roof & flashing inspectionWalk-through inspection, debris clearance | Sub | ||||||||||||
| Exterior glass & window washingWindows, doors, glass guards | Sub | ||||||||||||
| Exterior paint & caulkingVisual inspection, spot repair | Buildwise | ||||||||||||
| Hose bibs & sprinkler start-upTurn on, check for leaks, program timers | Sub | ||||||||||||
| Sprinkler blow-out & bib shutoffDrain lines before first freeze | Sub | ||||||||||||
| Deck oiling (Ipe)Only if natural finish is preferred | Sub | ||||||||||||
| Shou sugi ban tung oil refreshAnnual re-oil on a warm dry day | Sub | ||||||||||||
| Cladding annual walkCaulk, panels, fasteners — Buildwise | Buildwise | ||||||||||||
| Stone veneer weep clearConfirm bottom weep is unblocked by mulch | Owner | ||||||||||||
| Mechanical · HVAC & Plumbing | |||||||||||||
| Forced-air filter changeStandard MERV 13 filter | Owner | ||||||||||||
| ERV filter change & annual serviceClean core, replace filters | Sub | ||||||||||||
| A/C seasonal serviceClean outdoor unit, drain lines | Sub | ||||||||||||
| Tankless / heat-pump WH serviceDescale, anode check, sediment flush | Sub | ||||||||||||
| Sewer drain scopeCamera main line from clean-outs | Sub | ||||||||||||
| Sump pump inspectionFunction test, battery backup check | Sub | ||||||||||||
| Water softener salt refillMorton Clean & Protect, ~2 bags | Owner | ||||||||||||
| Carbon pre-filter changeAquasana Rhino pre-filter cartridge | Buildwise | ||||||||||||
| UV sterilizer bulb replacementAnnual replacement (Viqua VH410M) | Buildwise | ||||||||||||
| Sump pump function testPour 5-gal bucket into basin | Owner | ||||||||||||
| Sump backup battery testPress test button on Aquanot 508 | Owner | ||||||||||||
| Sewage ejector inspectionLiberty LE51A — professional clean | Buildwise | ||||||||||||
| Gas manifold leak checkLicensed plumber, CSST visual | Sub | ||||||||||||
| Backflow preventer cert. testWilkins 720A — required by City of LA | Sub | ||||||||||||
| Generator annual serviceGenerac 22kW — oil + filter | Sub | ||||||||||||
| Interior & Life Safety | |||||||||||||
| Smoke & CO detector testMonthly button test; battery swap yearly | Owner | ||||||||||||
| GFCI receptacle testBathrooms, kitchens, exterior | Owner | ||||||||||||
| Dryer vent cleaningLint trap & full vent run | Sub | ||||||||||||
| Chimney & flue inspectionBoth fireplaces | Sub | ||||||||||||
| Duct & carpet cleaningProfessional service | Sub | ||||||||||||
| Smoke / CO battery replacementAll 14 interconnected units | Owner | ||||||||||||
| Security panel testPress monthly test button on Alarm.com | Owner | ||||||||||||
| Wi-Fi mesh rebootReboot UDM Pro via UniFi app | Owner | ||||||||||||
| Garage door force testLift manually with operator disconnected | Owner | ||||||||||||
| Front gate track inspectionWalk track, clear debris (3-bay garage gate) | Owner | ||||||||||||
Care & Cleaning
Windows & Doors
Plumbing Fixtures
Lighting
Tile & Stone
Cabinetry & Millwork
Countertops
Flooring
Paint & Finishes
Appliances
Exterior Cladding
HVAC Schedule
| Component | Make & Model | Serial | Installed | Manufacturer Resource |
|---|---|---|---|---|
Air-Source Heat Pump Exterior · North Wall |
Mitsubishi Electric PUZ-HA60NHA5 |
2509-MEA-00412 | 08 / 22 / 2025 | Manual & parts → |
Indoor Air Handler Mech. Room · Main Flr |
Mitsubishi Electric SVZ-KP60NA |
2509-MEA-00413 | 08 / 22 / 2025 | Manual & parts → |
Heat-Pump Water Heater Mech. Room · Main Flr |
Rheem ProTerra PROPH80 T2 RH375 30 |
RHM-2025-08-7742 | 08 / 28 / 2025 | Manual & parts → |
Energy Recovery Ventilator Attic · Central |
Broan AI Series B210E65RS |
BRN-25-091112 | 09 / 04 / 2025 | Manual & parts → |
Zone Control Thermostats Main Flr · Upper Flr · Primary |
Ecobee Smart Premium EB-STATE6P-01 |
— (3 units) | 09 / 08 / 2025 | App setup → |
Kitchen Range Hood Kitchen |
Vent-A-Hood PRH18-248 |
VAH-25-8834 | 09 / 09 / 2025 | Manual & parts → |
Humidifier Mech. Room · Inline |
Aprilaire 600M 600M |
APR-25-0914 | 09 / 10 / 2025 | Manual & parts → |
Electrical & Life Safety
| Component | Make & Model | Serial | Installed | Manufacturer Resource |
|---|---|---|---|---|
Whole-Home Standby Generator Exterior · South Side · Gas-fired |
Generac Guardian 22kW · G70552 |
GEN-2025-09-1188 | 09 / 12 / 2025 | Owner portal → |
Automatic Transfer Switch Garage · Adjacent to main panel |
Generac RXSW200A3 200A · Service Entrance Rated |
GEN-ATS-25-0421 | 09 / 12 / 2025 | Manual → |
EV Charger (Primary) Garage · North Bay |
Tesla Wall Connector Gen 3 48A / 11.5kW |
TWC-25-78821 | 09 / 14 / 2025 | App setup → |
Lighting Control Processor Mech. Room · Low-voltage rack |
Lutron RadioRA 3 RR-MAIN-REP-WH |
LTR-RA3-25-3210 | 09 / 09 / 2025 | App setup → |
Structured Wiring / Network Panel Mech. Room · 2nd floor |
Leviton 28" Structured Media 47605-28W |
LEV-28-25-1142 | 09 / 04 / 2025 | Diagram → |
Wi-Fi Mesh System Network rack · 4 access points |
Ubiquiti UniFi U6 Pro ×4 · 1× UDM Pro router |
UBI-25-8821 (router) | 09 / 10 / 2025 | App setup → |
Security & Alarm Panel Mech. Room · Adjacent to main panel |
Alarm.com Smart Hub ADC-SVR200-VT-A2 |
ACM-25-22008 | 09 / 11 / 2025 | Account & monitoring → |
Interconnected Smoke / CO Detectors 14 units · Every bedroom, hallway, mechanical room |
First Alert SC9120B Hardwired w/ battery backup |
— (14 units, lot 25-FA-3300) | 09 / 08 / 2025 | Manual → |
Garage Door Operators (×3) Garage · 3 bays |
LiftMaster 8500W Wall-mount, WiFi-enabled |
LM-25-8822 / 8823 / 8824 | 09 / 16 / 2025 | MyQ app → |
Front Gate Operator Driveway entry · East |
LiftMaster CSL24UL Single-slide commercial |
LM-CSL-25-1109 | 09 / 18 / 2025 | Manual → |
Plumbing Systems
| Component | Make & Model | Serial | Installed | Manufacturer Resource |
|---|---|---|---|---|
Whole-Home Water Softener Mech. Room · Main Flr · After PRV |
Kinetico Premier S150 Twin-tank, non-electric |
KIN-25-9012 | 09 / 02 / 2025 | Service portal → |
Whole-Home Carbon Filtration Mech. Room · After softener |
Aquasana Rhino EQ-600 Pre-filter + carbon + post-filter |
AQS-25-3320 | 09 / 02 / 2025 | Manual → |
UV Sterilizer (Polish) Mech. Room · Final stage before manifold |
Viqua VH410M 12 gpm / 254nm |
VQA-25-1124 | 09 / 02 / 2025 | Manual → |
Hot Water Recirculation Pump Mech. Room · Inline · Variable-speed |
Grundfos UPS15-58FRC 3-speed, timer + temp control |
GRD-25-8841 | 08 / 28 / 2025 | Manual → |
Sump Pump Mech. Room · Floor sump |
Zoeller M53 1/3 HP, cast iron |
ZLR-25-7714 | 08 / 25 / 2025 | Manual → |
Sump Pump Battery Backup Mech. Room · Adjacent to primary sump |
Zoeller Aquanot 508 DC backup w/ alarm |
ZLR-AQN-25-7715 | 08 / 25 / 2025 | Manual → |
Sewage Ejector Pump Basement · Powder bath + laundry rough-in |
Liberty LE51A 1/2 HP, automatic, 2" discharge |
LBR-25-4422 | 08 / 26 / 2025 | Manual → |
Gas Manifold & Shut-Off Exterior · West side · Behind irrigation |
Tracpipe CSST 1¼" main · 9 branch lines |
— (system, certified 09/12/2025) | 09 / 12 / 2025 | CSST guide → |
Irrigation Controller Garage · Adjacent to gate operator |
Rachio 3 (12-zone) 8ZULW · Weather Intelligence Plus |
RCH-25-1199 | 09 / 18 / 2025 | App setup → |
Backflow Preventer (Irrigation) Exterior · Irrigation entry · East side |
Wilkins 720A ¾" PVB |
WLK-25-2208 | 09 / 18 / 2025 | Annual test → |
Permits, Plans & Reports
| Document | Prepared By | Date | Access | |
|---|---|---|---|---|
| Architectural Plans | ||||
PDF |
Approved Permit Set — Full Drawings
Cover, site plan, floor plans, elevations, sections, details, structural — 20 sheets.
|
McCullough Architects | 08 / 07 / 2023 | Open → |
PDF |
Interior Elevations
Room-by-room interior elevations, cabinetry, tile layouts, fixture schedules.
|
Hyrel Mathias Interior Design | 02 / 19 / 2024 | Open → |
PDF |
Landscape & Site Plan
Permeable paver layout, planting plan, irrigation, sport court, fence details.
|
Core Design, Inc. | 05 / 10 / 2024 | Open → |
| Engineering Reports | ||||
PDF |
Structural Drawings & Calculations
Sheets S-0.0, SD-1, SD-2, SD-3, SD-4 — notes, details, hold-downs, shear.
|
Mulhern & Kulp Structural | 09 / 10 / 2021 | Open → |
PDF |
Boundary & Topographic Survey
Legal boundaries, site topography, existing conditions prior to construction.
|
Core Design, Inc. | 04 / 20 / 2021 | Open → |
PDF |
Impervious Surface Survey
Certified calculation of 42.59% impervious coverage per City of Los Angeles code.
|
Core Design, Inc. / R. West, PLS | 09 / 17 / 2024 | Open → |
| Permits & Approvals | ||||
PDF |
City of Los Angeles Building Permit
Permit No. 21-121972 BS · Building, grading, utilities, right-of-way, land use approvals.
|
City of Los Angeles LADBS | 09 / 17 / 2024 | Open → |
PDF |
Agreement for Pervious Surface Maintenance
Recorded covenant. King County Recording No. 20240916000524.
|
City of Los Angeles / Owner | 09 / 16 / 2024 | Open → |
PDF |
Final Tree Removal Plan
Arborist report, tree retention calculations, removal approvals.
|
Core Design / Arborist | 07 / 08 / 2024 | Open → |
| Certificates of Inspection | ||||
PDF |
Final Building Inspection
Certificate of Occupancy, issued after final life-safety & structural sign-offs.
|
City of Los Angeles LADBS | 09 / 11 / 2025 | Open → |
PDF |
Final Electrical Inspection
L&I certification of all electrical rough & finish.
|
WA Labor & Industries | 09 / 09 / 2025 | Open → |
PDF |
Final Plumbing & Mechanical
Gas pressure test, water pressure test, mechanical final.
|
City of Los Angeles LADBS | 09 / 10 / 2025 | Open → |
PDF |
Blower Door Test Report
2.0 ACH50 achieved — exceeds 2018 WSEC requirement of 5.0 ACH50.
|
Cedar Mechanical / Third-Party | 09 / 05 / 2025 | Open → |